Water Allocations as at 15 December 2017

By | 15/12/2017

Water authorities periodically update the water allocations. This is the percentage of the share component given to each water licence as allocation water. Here are the allocations as at 15 December 2017. The next update will be on 2 January 2018.

Victoria

High Reliability

Murray 100 % (unchanged)
Broken 100 % (unchanged)
Goulburn 100 % (unchanged)
Campaspe 100 % (unchanged)
Loddon 100 % (unchanged)
Bullarook Creek 100 % (unchanged)

Low Reliability

Broken 100 % (up from 63 %)
Campaspe 49 % (up from 46 %)
Bullarook Creek 100 % (unchanged)
All other systems 0 %

Groundwater

Katunga WSPA 100 % (unchanged)
Lower Campaspe Valley WSPA 100 % (unchanged)
Loddon Highlands 75% Newlyn Zone 100% all other zones
Mid-Loddon GMA 100 %
Lower Ovens GMA 100 % (unchanged)
Other GMUs and unincorporated areas 100 % (unchanged)

 

New South Wales

High Security

Murray 97 % (unchanged)
Murrumbidgee 95 % (unchanged)
Lower Darling 100 % (unchanged)
Lachlan 100 % (unchanged)
Macquarie 100 % (unchanged)
Cudgegong 100 % (unchanged)
Upper Namoi 100 % (unchanged)
Lower Namoi 100 % (unchanged)
Gwydir 100 % (unchanged)
Bega-Brogo 100 % (unchanged)

General Security

Murray 46 % (up from 39 %)
Murrumbidgee 33 % (unchanged)
Lower Darling 100 % (unchanged)
Lachlan 2 % (unchanged)
Macquarie 38 % (unchanged)
Cudgegong 38 % (unchanged)
Upper Namoi 100 % (unchanged)
Lower Namoi 7.08 % (unchanged)
Gwydir 17.17 % (up from 16.11 %)
Bega-Brogo 70 % (up from 45 %)

Groundwater

Lower Murrumbidgee 100 % (unchanged)
Lower Murray 100 % (unchanged)

 

South Australia

Murray 100 % (unchanged)

 

References

Victoria
GMW Groundwater
New South Wales
South Australia

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.